Work / Case study · Originally published 2018
Neste
A supplier network for a transparent supply chain.
Making a palm oil supply chain transparent by letting suppliers prove their own certification.
- Client
- Neste
- Year
- 2017
- Sector
- Renewable fuels
- My role
- Concept lead · Nortal hackathon team
- Themes
- Sustainability, Trust, Technology
- Sheet
- 20
At Neste's Hack the Supply hackathon, my Nortal team proposed a network where palm oil suppliers prove their own certification. Neste chose Nortal to build the demo, which grew into its Supplier Sustainability Portal.
- 01What we created
- Concept
- Interface prototype
- Pitch
- 02My role
I led our Nortal team of five, shaped the concept and presented it to the judges.
- 03Recognition
- Honorary mention, Neste Hack the Supply 2017
Full story
Originally published 2018-12-30
Neste, a Finnish oil refiner focusing heavily on sustainability, was ready for some radical innovations to ensure the transparency of their supply chain. They organised an event, called Hack the Supply, a 24-hour hackathon event in May 2017, together with Slush, a tech start-up accelerator. The event took place simultaneously in Helsinki and Singapore. Its aim was to create a new concept for improving and digitalising Neste’s Bio-oil Supplier Due Diligence System. In other words, Neste wanted an innovative way for them to manage their highly complicated supply chains and track the bio compliance and certifications of their suppliers. The bulk of them being Indonesian palm oil plantations, smallholdings and local partners. Certification and compliance is of utmost importance to see that the origin of the raw materials is verified, the surrounding rainforests aren’t being chopped down for more plantations and to make sure the local working conditions are up to standard (good health, safety, environmental, and social issues) for the workers.

I had three minutes to present our concept to the judges.
I led our Nortal team of five as Creative Lead to push for a different and more useful solution than one more new dashboard. Our idea “The Neste ecosystem of sustainable suppliers” focused on openness, transparency and co-operating with the suppliers themselves. It was akin to a LinkedIn for biofuel suppliers. The local suppliers would create a public profile in Neste’s proprietary network to prove they are certified, what they produce and what their working conditions are like. The incentive for them would be that they could become one of Neste’s preferred suppliers if all of their certificates and compliance matters are in order.

Look at the schedules and routes and switch from map view to comparison view to optimise your suppliers and shipments.
The social network could be linked to supply chain planning tools and a clearly visualised dashboard. Each step was made to look simple, regardless of the number of data points shown on screen. An important idea behind the interface was that it should be both tool for Neste’s supply chain managers to optimise shipments, and a network for the local suppliers to co-operate with Neste, share with each other and get the help they need to attain all the certificates needed.

The supplier information can be laid out in a map and filtered according to every criteria. If you want to see the corn oil shipment due today to the refinery in Rotterdam, just activate the tracking system.
Four criteria
We aimed the idea at the four things the judges scored: innovativeness, usefulness for the end user, technical feasibility and the quality of the pitch.

Illustration: Mari-Liis Kärsten, from an original photo by Neste.
Innovativeness. Social networks had been around for over a decade. Our idea was to make supply chain information public. Transparency is the best guarantee of sustainability and a key value at Neste, yet open networks are rarely used between companies, suppliers and NGOs. Like LinkedIn, the dashboard would show when a supplier profile was only “85% complete” and give tips on reaching the missing certifications. The best practices of “100% complete” suppliers would stand out and be copied, spreading good working conditions and environmental standards to other suppliers. Neste would also get a channel for finding new sustainable suppliers.

A supplier profile shows how complete it is and what is missing to meet Neste’s minimum requirements.
Usefulness for the end user. The network was built for everyone in the supply chain: suppliers, Neste’s supply chain planners and NGO auditors, as well as Neste’s own staff. Suppliers could talk to each other, NGOs could talk to suppliers and Neste, and Neste could mentor suppliers with the help of NGOs. Small suppliers could form co-ops or get noticed despite limited marketing resources.

Join the supplier ecosystem: rated supplier profiles, side by side.
Technical feasibility. Knowing where suppliers are and what shipments they can produce, the network becomes a map and a supplier comparison system. The next step would be matching the right suppliers to the right deliveries.
![]()
Tracking a supplier’s shipment on its way to the refinery.
Quality of the pitch. Each step was made to look simple, however many data points were on screen. When a supply chain planning system feels like a social network, it puts your mind at ease.
With a transparent supply chain from producer to consumer, people could look beyond the price at the pump to which part of the planet their fuel comes from.
The jury gave us an honorary mention for a fresh concept that put great emphasis on openness and transparency.
Watch the video on YouTube A compilation video of Neste’s Hack the Supply hackathon.
A more detailed story of our project can be seen here on my piece for Nortal’s blog: Pumping ideas for Neste.

Our fantastic designers David Castillo and Mari-Liis Kärsten created stunning visuals for what the sustainability tracking system could look like. Thanks to the 17 years of experience with Neste and the expertise of Juha Virko and Kalle Mattas (not in picture), we could spell out how our solution could be integrated into Neste’s existing systems, and how Neste’s supply chain planning tools could add value to the network.
Update: Based on our hackathon performance, Neste decided to choose Nortal to develop the demo version of the sustainable supplier portal!
After evaluating the ideas of all the hackathon finalists, we decided to partner up with Nortal. They had just the right kind of special expertise to supplement Neste’s own resources.
– Tommi Tuovila, CIO, Neste
Ours was the only hackathon team Neste went on to partner with to build a real product.
Update 2: The demo was presented at the Annual Roundtable Conference on Sustainable Palm Oil in Bali in November 2017 and Neste is now developing a new digital Supplier Sustainability Portal based on our demo. Neste combined ideas from ten hackathon teams with its own and built the demo with Nortal. The demo showed a supplier which criteria it must meet to become eligible, alerted it when a certificate was about to expire, and helped Neste see which suppliers most needed training or support.
Update 3: Neste has launched the first operational version of its Supplier Sustainability Portal (SSP) for a selected group of renewable products’ raw material suppliers in 2018. The portal will be tested and further developed during the first half of 2019, and implemented gradually with a target of covering all Neste’s renewable raw material suppliers by the end of 2019.